My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-19_REVISION - C1981019 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-03-19_REVISION - C1981019 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2018 9:50:07 AM
Creation date
3/20/2018 9:32:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/19/2018
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company
Type & Sequence
MR182
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Materials consistency description: Partly consolidated stockpile 1.1 <br /> <br />Average push <br />gradient: <br />0 % <br />Average site altitude: 7,600 feet <br /> <br />Material weight: 1,600 lbs/LCY <br /> <br />Weight description: Top Soil <br />Job Condition Correction Factor Source <br />Operator Skill: 0.900 (AB.AVG.) <br />Material consistency: 1.100 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 1.000 (DOZ-OC) <br />Push gradient: 1.000 (CAT HB) <br />Altitude: 0.930 (CAT HB) <br />Material Weight: 1.438 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 1.0989 <br /> <br />Adjusted unit <br />production: 3,154.17 LCY/hr <br />Adjusted fleet <br />production: 3154.17 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.154/LCY <br /> <br />Total job time: 0.05 Hours <br />Total job cost: $25 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.