Laserfiche WebLink
<br />COST SUMMARY WORK <br /> <br />Task description: <br />Site: Colowyo Coal Mine Permit Action: MR182 Permit/Job#: C1981019 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 3/19/2018 County: Moffat Filename: C019-000 <br />User: ZTT <br />Agency or organization name : DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />001 Regrade Topsoil for Raw Water Line Expansion <br />(MR182) <br />DOZER 1 0.05 $25.00 <br />002 Reseed Raw Water Line Expansion (MR182) REVEGE 1 0.50 $1,200.00 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />0.55 <br /> <br />$1,225 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $24.75 <br />Performance bond: 1.05 Total = $12.86 <br />Job superintendent: 0.28 Total = $20.09 <br />Profit: 10.00 Total = $122.50 <br /> TOTAL O & P = $180.20 <br /> CONTRACT AMOUNT (direct + O & P) = $1,405.20 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT : <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 2.00 Total = $28.10 <br />Reclamation management and/or administration: 1.91 $26.84 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br /> <br />TOTAL INDIRECT COST = $235.14 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $1,460.14 <br /> <br /> <br />