Laserfiche WebLink
COLORADO <br />Division of Reclamation, <br />A7Mining and Safety <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight,) Basis: <br />Materialweight: 1,600 Pounds/LCY <br />Description: Top Soil <br />Rated Payload: 492,200 Pounds <br />Payload Capacity: 307.63 LCY <br />TruckBed (volume) Basis: <br />Struck Volume: <br />153.00 <br />LCY <br />Heaped Volume: <br />192.00 <br />LCY <br />Average Volume: <br />172.50 <br />LCY <br />Adjusted Volume: <br />192.00 <br />LCY <br />Final Truck Volume Bas ed on Number of Loader Passes: <br />Loading Tool Capacity <br />Rated Capacity: 53.000 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other- rock/dirt mixtures <br />Adjusted Capacity: 58.300 LCY <br />174.90 LCY <br />Bucket Size Class: NA <br />Job Condition Corrections: Site Altitude (ft.): 7600 feet <br />Truck Loader Source <br />Altitude Ad: 1.000 0.980 (CAT HB) <br />Job Efficiencv: 0.830 0.830 (CAT HB) <br />Net Correction: 1 0.830 1 0.813 <br />Loading Tool Cycle Time: Number of Loading ToolPasses Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Lo aders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA <br />Maneuver: NA <br />Dump: 0.100 <br />3 passes <br />Wheel and Track Loaders -Unadjusted Basic Loader Cycle Time (load, dump, 0.725 minutes <br />maneuver): <br />Cycle Time Factors I I Factor (min.) I Source <br />flF'C-0 <br />H <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining. state. co. us I <br />John W. Hickenlooper, Governor I Robert W. Randall, Executive Director I Virginia Brannon, Director * r 1876 4 <br />