My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-16_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-03-16_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2018 7:57:01 AM
Creation date
3/20/2018 7:35:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/16/2018
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company, LP
Type & Sequence
TR119
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 10 <br />TRUCK/LOADER TEAM WORK <br />Task description: Load, Haul and Regrade Topsoil Haul Road A Widening <br />Site: Colowyo Coal Mne Permit Action: TRI 19 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: 002 State <br />Date: 3/16/2018 County <br />User: ZTT <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />Colorado <br />Moffat <br />DRMS <br />t Descrinti <br />i i ui;n i.uauci 1 caui-1 i urn. X�Iviviri i au oJvn <br />-Loader: LETOURNEAU L2350 <br />Support Equipment -Load Area: Cat D11T - l lU <br />-Dunip Area: Cat D11T - HU <br />Road Maintenance -Motor Grader: CAT 16M <br />-Water Truck: Water Tanker.14.000 Gal. <br />Cost Breakdown: Truck/LoaderTeam <br />Abbreviation: None <br />Filename: C019-002 <br />Shift basis: l per day <br />Support Equipment Maintenance Equipment <br />Total work team cost/hour: $4,020.61 <br />MATERIAL OUANTITIES <br />Initial volume: 58,080 CCY Swell factor: 1.215 <br />Loose volume: 70,567 LCY <br />Source ofestimatedvolume: Division ofReclamation, Mining & Safety <br />Source ofestimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />WaterTruc <br />%Utilization -machine: <br />100 <br />100 <br />100 <br />100 <br />50 <br />50 <br />Ownership cost/hour: <br />$186.73 <br />$354.06 <br />$226.13 <br />$226.13 <br />$72.40 <br />$74.07 <br />Operating cost/hour: <br />$186.98 <br />$367.13 <br />$183.90 <br />$183.90 <br />$28.99 <br />$54.40 <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripperown. cost/hour. <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$31.90 <br />$41.20 <br />$41.85 <br />$41.85 <br />$28.90 <br />$21.39 <br />Unit Subtotals: <br />$405.61 <br />$762.39 <br />$451.88 <br />$451.88 <br />$130.28 <br />$149.86 <br />Number of Units: <br />4 <br />1 <br />1 <br />2 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$2,384.83 <br />Support: <br />$1,355.64 <br />Maint: <br />$280.14 <br />Total work team cost/hour: $4,020.61 <br />MATERIAL OUANTITIES <br />Initial volume: 58,080 CCY Swell factor: 1.215 <br />Loose volume: 70,567 LCY <br />Source ofestimatedvolume: Division ofReclamation, Mining & Safety <br />Source ofestimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.