Laserfiche WebLink
Averagepush <br />gradient: <br />Averages ite altitude: <br />Materialweight: <br />15% <br />7,600 feet <br />2,650 lbs/LCY <br />Weight description: Decomposedrock-25%Rock, <br />75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.900 <br />(AB.AVG ) <br />Material consistency: <br />1.000 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />(GIN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Push gradient: <br />0.666 <br />(CAT HB) <br />Altitude: <br />0.930 <br />(CAT HB) <br />MaterialWeight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.4016 <br />Adjustedunit <br />production: <br />Adjustedfleet <br />production: <br />JOB TIME AND COST <br />1,152.71 LCY/hr <br />1152.71 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.421/LCY <br />Total job time: 440.36 Hours <br />Totaljob cost: $213,561 <br />Page 4 of 10 <br />CIRCES Cost Estimating Software <br />