Laserfiche WebLink
Page 3 of 10 <br />BULLDOZER WORK <br />Task description: Regrade Haul Road Widening <br />Site: Colowyo Coal NEne Permit Action: TRI 19 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: 001 State <br />Date: 3/16/2018 County <br />User: ZTT <br />Agency or organization name <br />HOURLY EOUIPMENT COST <br />Colorado <br />Moffat <br />DRMS <br />Basic Machine: <br />Cat D11T - l lU <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />1-s hank ripp er <br />Shift Basis: <br />1 perday <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Totalunit Cost/Hour: $484.97 <br />TotalFleet Cost/Hour: $484.97 <br />Utilization % <br />$226.13 1 NA <br />$21.79 I NA <br />$41.85 <br />me <br />MATERIAL QUANTITIES <br />Initial Volume: 406,089 <br />Swell factor: 1.250 <br />Loosevolume: 507,611 LCY <br />Source of estimatedvolume: Division ofReclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Averagepush distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />2,870.3 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Abbreviation: None <br />Filename: C019-001 <br />CIRCES Cost Estimating Software <br />