Laserfiche WebLink
Page 7 of 10 <br />Material: <br />Material 6" and over diameter 0.03 <br />0.030 <br />(Cat HB) <br />Stockpile: <br />Conveyor ordozerpiled 10 ft. high and up <br />0.00 <br />0.000 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership oftrucks and loaders - <br />0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />Cat HB <br />Net Cycle Tine Adjustment: -0.050 minutes <br />AdjustedLoader Cycle Time: 0.675 minutes <br />Net Load Time per Truck: 1.450 minutes <br />Truck Cvcle Time: <br />Truck Exchange Time: 0.80 <br />Minutes Adjusted for site altitude: 0.800 Minutes <br />Truck Load Time: 1.450 <br />Minutes Adjusted for site altitude: 1.480 Minutes <br />TruckManeuver and Dump 1.20 <br />Minutes Adjusted for s ite altitude: 1.200 Minutes <br />Time: <br />1 <br />Truck Travel (Haul & Return, Time: <br />Road Condition: Hard, smooth, stabilized, surfaced, watered, <br />maintained 2.0 <br />N <br />Han l Rm to <br />Time <br />Seg# <br />HaulDistance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Trave <br />1 <br />(Ft) <br />-5.00 <br />(%) <br />N <br />(fpm) <br />Time <br />(min) <br />1 <br />2000.00 <br />5.00 <br />2.00 <br />7.00 <br />1160 <br />1.912 <br />Haul Time: 1.912 minutes <br />Return Route: <br />Seg# <br />HaulDistance <br />(Ft) <br />Grade (%) <br />Roll. Res <br />N <br />Total Res <br />N <br />Velocity <br />(fpm) <br />rave <br />Time <br />min <br />1 <br />2000.00 <br />-5.00 <br />2.00 <br />-3.00 <br />3503 <br />0.614 <br />Loading Toolunit <br />Production 4,603.46 LCY/Hour <br />Truck Unit Production <br />1,747.37 LCY/Hour <br />Return Time: 0.614 minutes <br />Total Truck Cycle Time: 6.006 minutes <br />Adjustedforjob efficiency: 3,820.87 LEY/Hour <br />Adjustedforjob efficiency: 1,450.32 LCY/Hour <br />Optimal No. of Trucks: 3 Truck(s) Selected NumberofTrucks: 4 Truck(s) <br />Adjustedhourly truck teamproduction: 5,801.27 LEY/Hour <br />Adjusted single truck/loaderteamproduction: 3,820.87 LCY/Hour <br />Adjusted multiple truck/loaderteamproduction: 3,820.87 LEY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 <br />Team(s) Total job time: <br />18.47 Hours <br />Unit cost: $1.052 /LCY Totaljob cost: $74,256 <br />