Laserfiche WebLink
Cost Summary Worksheet Cont'd <br />Task# 000 <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.900 <br />(AB.AVG) <br />Material consistency: <br />1.200 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />(GIN.) <br />Visibility: <br />1.000 <br />AVG. <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />1.000 <br />(DOZ-OC) <br />Push gradient: <br />0.422 <br />(CAT HB) <br />Altitude: <br />0.930 <br />(CAT HB) <br />MaterialWeight: <br />0.868 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.3054 <br />Adjustedunit <br />production: <br />Adjustedfleet <br />production: <br />JOB TIME AND COST <br />876.59 LCY/hr <br />3506.36 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.540/LCY <br />Total job time: 85.92 Hours <br />Totaljob cost: $162,780 <br />Page 8 of40 <br />CIRCES Cost Estimating So$ware <br />