Laserfiche WebLink
Cost Sunnnary Worksheet Cont'd Task# 000 <br />BULLDOZER WORK <br />Page 7 of40 <br />Taskdcscription: Regrade Collom Facility Area <br />Site: Colowyo Coal Mine Permit Action: TRI 18 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task#: 015 State <br />Date: 3/14/2018 County <br />Us er: ZTT <br />Agency or organization name <br />HOURLY EOUIPMENT COST <br />Colorado <br />Moffat <br />DRMS <br />Basic Machine: <br />CatDllT - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />1-s hank ripp er <br />Shift Bas is: <br />1 perday <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/flour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />Operator Cost/Hour: <br />Abbreviation: None <br />Filename: C019-015 <br />$226.13 <br />Utilization % <br />NA <br />$183.90 <br />100 <br />$21.79 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />Total unit Cost/Hour: $473.67 <br />TotalFleet Cost/Hour: $1,894.66 <br />MATERIAL OUANTITIES <br />Initial Volume: 241,000 <br />Swell factor: 1.250 <br />Loose volume: 301,250 LCY <br />Source ofestimatedvolume: Division ofReclamation, Mining & Safety <br />Source ofestimatedswell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 2,870.3 LCY/hr <br />production: <br />Materials consistency description: Loose stockpile 1.2 <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Materialweight <br />25% <br />7,600 feet <br />lbs/LCY <br />Weight description: Decomposed rock -25%Rock 75% Earth <br />CIRCES Cost Estimating So$ware <br />