My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-14_REVISION - C1981019 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-03-14_REVISION - C1981019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2018 7:39:15 AM
Creation date
3/20/2018 7:19:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/14/2018
Doc Name Note
Cost Estimate
Doc Name
Adequacy Review #2
From
DRMS
To
Colowyo Coal Company
Type & Sequence
TR118
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task# 000 Page 10 of 40 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Net Correction: 0.830 I NA <br />Travel Time: <br />Road Condition: Hard, smooth, stabilized, surfaced, watered, maintained 2.0 <br />Haul Route: <br />Site Altitude: 7500 feet <br />Seg # <br />Scraper <br />Push Dozer Source <br />Altitude Ad: <br />1.000 <br />NA CAT HB <br />Job Efficiency: <br />0.830 <br />NA (CAT HB) <br />Net Correction: 0.830 I NA <br />Travel Time: <br />Road Condition: Hard, smooth, stabilized, surfaced, watered, maintained 2.0 <br />Haul Route: <br />Site Altitude: 7500 feet <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Trammel Time <br />(min) <br />1 <br />6500.00 <br />5.00 <br />2.00 <br />7.00 <br />1362 <br />4.82 <br />HaulTime: 4.82 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />001n) <br />Travel Time <br />(ndn) <br />1 <br />6500.00 <br />-5.00 <br />2.00 <br />-3.00 <br />2972 <br />2.25 <br />Return Time: <br />2.25 <br />minutes <br />Total Scraper teamcycle time: <br />8.67 <br />minutes <br />Adjustedforjob conditions: <br />333.15 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjustedsingle scraper team (unit) hourly production: <br />333.15 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />1,332.60 <br />LCY/Hour <br />Unadjustedunit production/hour: 401.38 LCY/Hour <br />Optimal Number of Scrapers perpush dozer: <br />JOB TIME AND COST <br />Fleet size: 4 <br />Teams) Totaljobtime: 72.94 Hours <br />Unit cost: $3.386 /LCY Totaljob cost: $329,096 <br />CIRCES Cost Estimating So$ware <br />
The URL can be used to link to this page
Your browser does not support the video tag.