My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-14_REVISION - C1981019 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-03-14_REVISION - C1981019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2018 7:39:15 AM
Creation date
3/20/2018 7:19:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/14/2018
Doc Name Note
Cost Estimate
Doc Name
Adequacy Review #2
From
DRMS
To
Colowyo Coal Company
Type & Sequence
TR118
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task# 000 <br />BULLDOZER WORK <br />Taskdcscription: Regrade Ditch DI <br />Site: Colowyo Coal Mine <br />PROJECT IDENTIFICATION <br />Permit Action: TRI 18 <br />Task#: 025 State <br />Date: 3/14/2018 County <br />Us er: ZTT <br />Agency or organization name <br />HOURLY EOUIPMENT COST <br />Colorado <br />Moffat <br />DRMS <br />Basic Machine: <br />CatDllT - 11U <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />Shift Bas is: <br />1 perday <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/flour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />Operator Cost/Hour: <br />Page 11 of 40 <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: C019-025 <br />$226.13 <br />Utilization % <br />NA <br />$183.90 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />Total unit Cost/Hour: $451.88 <br />TotalFleet Cost/Hour: $451.88 <br />MATERIAL OUANTITIES <br />Initial Volume: 4,806 <br />Swell factor: 1.000 <br />Loose volume: 4,806 LCY <br />Source ofestimatedvolume: Exhibit 7-23B Table 1, Ex 7, Item 23 Fig. B-1 <br />Source ofestimatedswell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />50 feet <br />4,589.5 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Materialweight <br />0% <br />7,500 feet <br />lbs/LCY <br />Weight description: Decomposed rock -25%Rock 75% Earth <br />CIRCES Cost Estimating So$ware <br />
The URL can be used to link to this page
Your browser does not support the video tag.