Laserfiche WebLink
Clayton Wein -2- February 28, 2018 <br />Com- RMS - Please review the maps in Volumes 7 and Volume 9 of the permit and update <br />the maps related to section 2.03 as necessary to reflect any changes that may have <br />occurred. <br />BRL— Revised Volume 7, Map 01 and Volume 9, Maps 9-2 and 9-5 are enclosed. <br />4. DRMS - The Insurance Certificate for the Bowie No. I Mine Expires on February 1, 2018. <br />Please provide the Division with a copy of the new Insurance Certificate. <br />BRL—An updated insurance certificate has been transmitted to DRMS under separate <br />cover. <br />5. DRMS - During the Months of August 2017 and October 2017, six of the sediment ponds <br />at the Bowie No. I Mine were backfilled, regraded and seeded. Bin wall Ponds I through <br />4 and the Waste Pile Pond were removed at the East Mine, and the ROM Pond was <br />removed at the ROM Pile Area. These ponds were included in the Phase I request for <br />the SL -6 Bond Release Application. The SL -6 Application is currently under review by the <br />Division and has completed the Adequacy Review process. There are two sediment <br />ponds located at the Paonia Loadout and two ponds that remain in place at the West <br />Mine. According to the reclamation plan in the C-1981-038 Permit, these four ponds <br />will be included in future reclamation activities. <br />BRL — No comment required. <br />DRMS - Please review Section 2.04.11 of the permit (Volume I and Volume 7) and <br />update as necessary. Please ensure that the Threatened and Endangered Species list is <br />updated if necessary. <br />BRL — A threatened and endangered inventory was prepared for the mine and loadout. <br />The report was transmitted by letter dated December 1, 2015. The report is located in <br />Volume 9A, Fish and Wildlife Tab. Page 2.04-31 was amended to direct the reader to <br />the location of the ME inventory. The consumptive water use was also updated on <br />page 2.04-31. <br />C7�DIVIRS -The reclamation plan in Volume 7, for the Paonia Loadout, requires additional <br />information relating to reclamation activities remaining at the site. The 4,600 volt <br />substation, the tunnel under the Black Bridge Road, the metering point on Stevens <br />Gulch Road, the segment of the Farmer's Ditch in the culvert, the two sediment ponds, <br />and the trail trestle over the North Fork of the Gunnison River have been main concerns <br />included in comment letters to the Division. Please update the Reclamation Plan in <br />Volume 7 to include in depth detail about the reclamation activities to occur at the <br />Paonia Loadout. Please include a time table for reclamation activities that have already <br />occurred and future activities that have yet to occur at the site. <br />