My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-07_REVISION - C1981038 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2018-03-07_REVISION - C1981038 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2018 10:47:57 AM
Creation date
3/12/2018 6:43:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
3/7/2018
Doc Name Note
(Citizen)
Doc Name
Correspondence
From
Judy Martin
To
DRMS
Type & Sequence
RN7
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Clayton Wein -3- February 28, 2018 <br />BRL—Volume 7, Section 2.05 was revised to update the reclamatio _plan._The current <br />configuration of the Black Bridge Road is shown on new post mining land use map (Map <br />8A). <br />8. DRMS - The Division currently holds two bonds totaling $3,315,000.00. The Bond held <br />by the Division is in the form of two corporate sureties. The remaining reclamation <br />work to be conducted at the Bowie No. I East Mine, West Mine and Paonia Loadout <br />requires a surety of $3,264, 189.05. The bond held by the Division is an excess of <br />$50,810.95. The Reclamation liability for the permit was calculated for the SL -5 Bond <br />Release Application. The Division is currently conducting a new reclamation cost <br />estimate for the SL -6 Bond Release Application. The Division will forward that estimate <br />under separate cover. <br />BRL— No response required. <br />09.DRMS - Volume 7, Reclamation Cost Estimate for the Paonia Loadout. Please update the <br />chart in Section 3.05 to reflect current conditions at the Paonia loadout. Information <br />from the upcoming SL -6 cost estimate can be used once the bond release is issued. <br />BRL — Attached are new reclamation bond pages to be inserted into Volume 7, Tab 3.05. <br />Sincerely, <br />J. E. Stave -r <br />J. E. Stover, P.E. <br />Consulting Engineer <br />Cc: Paonia Public Library <br />OSM <br />BLM - Electronic <br />Basil Bear <br />Attachments: <br />,A—volume 1 Pp= 2.03-2 2.03-4 through 2.03-13, 2.03-23, 2.03-36 through 46 <br />Volume 7 Table of Contents <br />Volume 7 <br />Section 2.03 pages 2.03-1 through 2.03-14 <br />Volume 7 <br />Section 2.04, pages 2.04-31 and 2.04-32 <br />Volume 7 <br />Section 2.05 pages 2.05-1 through 2.05-45 <br />c4z;(olume 7 <br />Section 3.05 Bond Requirements <br />Volume 7 <br />Exhibit 14 Landowner e-mail <br />olume 7 <br />Map 01 Surface and Subsurface Ownership, Map 8 and Map 8A <br />olume 9 <br />Map 9-2 Surface Ownership. Mao 9-5 Subsurface Ownership <br />
The URL can be used to link to this page
Your browser does not support the video tag.