Laserfiche WebLink
February 27, 2018 C-1981-038/Bowie No. 1 Mine CCW <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 7 <br /> <br />There is a combination of a silt fence, berms and sediment logs used to help treat the surface runoff from the site. <br />The berms were in good repair and capable of functioning as designed. In the center of th e lowest contours of the <br />reclaimed Waste Pile Pond, the silt fence was in good repair. Behind the silt fence on the lowest contour, the <br />sediment logs were intact. There were no indications of erosion a t the reclaimed site or signs of instability. The <br />ac cess road to the site was also reclaimed at the same time. The straw mulch was sta ble. There were no <br />indications of sediment loss or instability. The Binwall Pond 1 reclamation site (Photo 1) was stable and had no <br />erosional issues identified. The site was partly covered in snow. There was no water flowing in the channel at the <br />time of the inspection. The reclaimed Binwall Pond 2 site was stable and mostly covered in snow. There were no <br />erosional features observed. The channel did not have any water flowing in it at the time of the inspection. The <br />Binwall Pond 3 reclamation site was covered with snow during the inspection. There were no indications of <br />instability or erosion. The channel did not have any water passing through it. The reclaimed site for Binwall Pond <br />4 was covered with snow. There were no erosional features observed and there were no signs of instability. There <br />was not any water in the channel. <br /> <br />The ROM Pond (Photo 2), located at the Run of Mine Area was backfilled, graded and seeded in the fall of 201 7. <br />The reclaimed site was covered with snow at the time of the inspection. There were no signs of instability and <br />there were no erosional features observed. The access road to the ROM Pond site was reclaimed at the same time. <br />The road was covered with snow. The road was stable and there were no erosional issues noted. <br /> <br /> <br /> <br />Photo 1: The Binwall Pond 1 reclamation site.