My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-05_REPORT - C1981041 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2018-02-05_REPORT - C1981041 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 7:36:30 AM
Creation date
2/6/2018 6:58:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
2/5/2018
Doc Name
Annual Reclamation Report
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2017
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. <br />-9- 2017 Annual Reclamation Report <br />Bond Release was approved on 20.2 acres with SL -8 on November 14, <br />2015. Located in the SEY4, Section 28 and the SWA Section 27, T10S, <br />R98W, 6th P.M. <br />Area - 20.2 acres <br />Date - April 2002 for CRDA2 and November 2002 for Upper Diversion <br />Seed Mix - For CRDA2 - "Seed Mix, Table 14-13", Upland Components <br />Seed Mix - For Upper Diversion - "Seed Mix, Table 14-8", Upland <br />Components <br />Phase I I I Bond Release — 20.2 acres <br />20. Cameo Borrow Area No. 2 - Material was excavated from CBA2 for the <br />covering of the CRDA1. Approximately 5.1 acres were seeded in April <br />2002, however a further disturbance will be needed here with the removal <br />of Pond 11. Approximately 0.6 acres were re -disturbed and re -seeded <br />during the reclamation of Pond 11. Phase I Bond Release was approved <br />on 2.7 acres with SL -2 on October 27, 2003. Phase II & III Bond Release <br />was approved on 2.1 acres with SL -8 on November 14, 2015. Phase II & <br />III Bond Release was approved on 0.6 acres with SL -9 on January 3, <br />2017. Located in the SE'/4, Section 28, T10S, R98W, 6th P.M. <br />Area - 2.7 acres <br />0.6 acres (re -disturbed) <br />Date - April 2002 <br />Seed Mix - "Seed Mix, Table 14-13", Upland Components <br />Phase III Bond Release — 2.7 acres <br />Pond 11 — The pond was filled, regraded, top -soiled and seeded. Phase I <br />Bond Release was approved on 1.2 acres with SL -8 on November 14, <br />2015. This area was covered with mud during a flash flood in July 2015. <br />The area was re -tilled, re -seeded and mulched in November 2015. Phase <br />II Bond Release was approved on 1.2 acres with SL -9 on January 3, 2017. <br />Postmining Land Use was changed to Commercial with PR -6 on January <br />3, 2017. Phase III Bond Release was approved on 1.2 acres with SL -10 <br />on August 29, 2017. <br />Area — 1.2 acres <br />Date — October 2012, Reseed November 2015 <br />Seed Mix — "Seed Mix, Table 14-8", Upland Components <br />Phase III Bond Release —1.2 acres <br />Permanent Disturbance - Coal Gulch Realignment - The acres <br />associated with the realignment of Coal Gulch, 1.4 acres, were approved <br />as permanent features on August 12, 2012 with PR -5. Phase I, 11 & III <br />Bond Release was approved on 1.4 acres with SL -8 on November 14, <br />2015. Located in the NY2NE'/4, Section 34 and the NW'/4NWY4, Section <br />35, T10S, R98W, 6th P.M. <br />Area — 1.4 Acres <br />Phase III Bond Release — 1.4 acres <br />21. Permanent Disturbance - Access Road and Power lines to No. 2 West <br />Portals - By agreement with the Bureau of Land Management, the access <br />
The URL can be used to link to this page
Your browser does not support the video tag.