Laserfiche WebLink
Snowcap Coal Company, Inc. -8- 2017 Annual Reclamation Report <br />approved on Dec. 14, 2010. Phase II & III Bond Release was approved <br />on 7.1 acres with SL -8 on November 14, 2015. Located in the SE% <br />Section 34, T10S, R98W, 6th P.M. <br />Area - 8.4 acres <br />Date - November 2002 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />Phase III Bond Release — 8.4 acres <br />17. Roadside South Portal Old Upper Diversion Ditch - This ditch was <br />removed and restored to approximate original contours during the <br />excavation of the Roadside Refuse Borrow Area. It was permanently <br />seeded with an approved seed mix during November of 2002. Phase I <br />Bond Release was approved on 1.1 acres with SL -2 on October 27, 2003. <br />Phase II & III Bond Release was approved on 1.1 acres with SL -8 on <br />November 14, 2015. Located in the SE% Section 34, T10S, R98W, 6th <br />P.M. <br />Area - 1.1 acres <br />Date - November 2002 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />Phase III Bond Release — 1.1 acres <br />18. Cameo Refuse Disposal Area No. 1 - Re-contoured upper bench, <br />regraded the top of the pile, covered all slopes, benches and the top of the <br />pile with 24 inches of material. Established collection ditches and rip - <br />rapped the ditches in accordance with the reclamation plan. This pile was <br />seeded during April 2002. Phase I Bond Release was approved on 14.8 <br />acres with SL -2 on October 27, 2003. Approximately one (1) acre was re - <br />disturbed in December 2009 on top of CRDA #1 as a lay down area for <br />coal refuse delivered from McClane Canyon Mine and remaining SCC <br />coal fines clean up. The one acre of re -disturbance was reclaimed and <br />reseeded in September 2010. Phase II &111 Bond Release was approved <br />on 13.8 acres with SL -8 on November 14, 2015. Phase II Bond Release <br />was approved on 1.0 acre with SL -9 on January 3, 2017. Postmining <br />Land Use was changed to Commercial on 1.0 acre with PR -6 on January <br />3, 2017. Phase III Bond Release was approved on 1.0 acres with SL -10 <br />on August 29, 2017. Located in the SE%, Section 28, T10S, R98W, 6th <br />P.M. <br />Area - 14.8 acres; 1 acre (reseed) <br />Date - April 2002; September 2010 (reseed) <br />Seed Mix - "Seed Mix, Table 14-13", Upland Components <br />"Seed Mix, Table 14-8", Upland Components (reseed) <br />Phase III Bond Release — 14.8 acres <br />19. Cameo Refuse Disposal Area No. 2 - The final reclamation of this refuse <br />pile included covering and top soiling the upper benches and the top of the <br />pile. Also a new diversion ditch was constructed just above the pile. The <br />Old Upper diversion ditch was reclaimed and restored to approximate <br />original contours and then reseeded. Phase I Bond Release was <br />approved on 20.2 acres with SL -2 on October 27, 2003. Phase 11 & III <br />