My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-05_REPORT - C1981041 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2018-02-05_REPORT - C1981041 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 7:36:30 AM
Creation date
2/6/2018 6:58:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
2/5/2018
Doc Name
Annual Reclamation Report
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2017
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. <br />-7- 2017 Annual Reclamation Report <br />Release was approved on 0.9 acres with SL -2 on October 27, 2003. <br />Phase II & III Bond Release was approved on 0.9 acres with SL -8 on <br />November 14, 2015. Located in the NE%, Section 2, T11 S, R98W, 6th <br />P.M. <br />Area - 0.9 acres <br />Date - October 2000 <br />Seed Mix - "Seed Mix, Table 14-6" <br />Phase III Bond Release — 0.9 acres <br />13. 2 West Portals - Portals & Overburden stockpile 13. Reference Exhibit <br />58. The two steep sloped portal areas were extensively roughened and <br />re -seeded due to poor establishment of vegetation from the 2000 seeding. <br />Phase I Bond Release was approved on 0.3 acres with SL -2 on October <br />27, 2003. Phase II & III Bond Release was approved on 0.3 acres with <br />SL -8 on November 14, 2015. Located in the NE'/, Section 11, T11S, <br />R98W, 6th P.M. <br />Area - 0.3 acres <br />Date - October 2000; (0.2 acres re -seeded in October 2005) <br />Seed Mix - "Seed Mix, Table 14-6"; (Re -seed "Salt Tolerant Seed Mix, <br />Table 14-15") <br />Phase III Bond Release — 0.3 acres <br />14. North Decline Mine Dewatering System - Permanent Mine Dewatering <br />Point installed and reclaimed during 2002. Phase I Bond Release was <br />approved on 0.5 acres with SL -2 on October 27, 2003. Phase II & III Bond <br />Release was approved on 0.5 acres with SL -8 on November 14, 2015. <br />Located in EY2NEY4 and NE'/4SE'/4, Section 34, T1 OS, R98W, 6th P.M. <br />Area - 0.5 acres <br />Date - April 2002 <br />Seed Mix - "Seed Mix, Table 14-13", Upland Components <br />Phase III Bond Release — 0.5 acres <br />15. Roadside Refuse Borrow Area - Area east of the Roadside Refuse Pile <br />excavated during 2002 for cover material for the Roadside Refuse Pile. <br />Phase I Bond Release was approved on 4.5 acres with SL -2 on October <br />27, 2003. Phase II Bond Release on 4.5 acres and Phase III Bond <br />Release on 3.4 acres were approved with SL -8 on November 14, 2015. <br />Located in SE% Section 34, T10S, R98W, 6th P.M. <br />Area — 4.5 acres <br />Date - November 2002 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />Phase I II Bond Release — 3.4 acres <br />16. Roadside Refuse Disposal Area (including new Upper Diversion <br />Ditch) - Re-contoured the refuse pile and placed 20" of cover material and <br />6" of topsoil on all slopes and benches. Seeded with approved seed mix <br />during November. Phase I Bond Release was approved on 7.1 acres with <br />SL -2 on October 27, 2003, and 1.3 acres with SL -4 on January 11, 2009. <br />The 1.3 acres achieved final Phase 11 & III Bond Release with SL -6, <br />
The URL can be used to link to this page
Your browser does not support the video tag.