Snowcap Coal Company, Inc. -10- 2017 Annual Reclamation Report <br />road was left in place and is considered a permanent disturbance. The <br />power line reclamation was finished during 2002. Phase I, II & III Bond <br />Release was approved on 3.8 acres with SL -8 on November 14, 2015. <br />Area - 3.8 acres <br />Date - July 2002 <br />Seed Mix - No backfilling or seeding required <br />Phase I II Bond Release — 3.8 acres <br />22. Roadside North Portal Mine Facilities and Stockpile Area — During <br />2002 all structures, materials and facilities were removed. The portal <br />decline was filled and the area was returned to approximate original <br />contours and then reseeded. In August 2003 approximately 0.1 acres <br />along the north bank of Coal Creek was re -seeded after it was re - <br />disturbed creating access for equipment while building the rock check <br />structure in Coal Creek. Phase I Bond Release was approved on 24.1 <br />acres with SL -2 on October 27, 2003. In December 2005 the northwest <br />section of the North Portal, approximately 3.8 acres, was re -seeded due to <br />poor establishment of vegetation from the 2002 seeding. In October 2012 <br />approximately 3.0 acres were re -disturbed and re -seeded during <br />reclamation of the North Portal sedimentation control features. Material <br />from Topsoil Pile #1 was used at Pond 13, flume area, CBA #1, Ponds 6 & <br />10 and portions of Pond 11 and the top soil pile area was graded and <br />seeded. Phase II & III Bond Release was approved on 21.1 acres with <br />SL -8 on November 14, 2015. Phase II Bond Release was approved on <br />0.1 acres and Phase II & III Bond Release was approved on 2.9 acres with <br />SL -9 on January 3, 2017. (Please Note: The 0_1 acres still awaiting <br />Phase III release has been incorporated into the "G" Substation area, <br />changing that acreage from 0.5 to 0.6 acres). Located in the SW% Section <br />27, T10S, R98W, 6t" P.M. <br />Area - 24.1 acres; <br />0.1 acres re -seed; <br />3.8 acres re -seed; <br />3.0 acres re -seed <br />Date - November 2002; <br />August 2003 re -seed; <br />December 2005 re -seed; <br />October 2012 re -seed <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components; <br />"Seed Mix, Table 14-8", Upland Components — re -seed; <br />"Salt Tolerant Seed Mix, Table 14-15" — re -seed; <br />"Seed Mix, Table 14-8", Upland Components — re -seed <br />Phase III Bond Release — 24.0 acres <br />"G" Substation - All structures at the G Substation were removed and area <br />was returned to approximate original contours and seeded. Phase I Bond <br />Release was approved on 0.5 acres with SL -8 on November 14, 2015. <br />(Please Note: The 0.1 acres still awaiting Phase III release above has <br />been incorporated into the "G" Substation area, changing this acreage <br />from 0.5 to 0.6 acres). Phase 11 Bond Release was approved on 0.6 acres <br />