Laserfiche WebLink
Bond Release - 2 - Revised November 17, 2017 <br />Revised January 19, 2018 <br />2017 Phase I Request SI -06 Requested Areas (PH 1) <br />-------------------------------------- ----- ----- <br />ROM Pond 2017 0.51 SL04 Released* <br />Pond 1 2017 2.31 Total for 4 ponds <br />Pond 2 2017 <br />Pond 3 2017 <br />Pond 4 2017 <br />--4 Gob Pile Pond 1 20171 1 0.45 1 SL04 Released* <br />*Reclamation work occurred in 2016, however, these areas were included in the boundaries that <br />obtained Phase 1 release with SL04. Therefore, they are not part of the Phase I area tabulation with SL06 <br />as the areas were already accounted for with the SL04 release. <br />--------- ----- <br />- - -- ---- -- <br />SL04 <br />SL06 <br />ZONE <br />DESCRIPTION <br />YEAR SEEDED <br />Approved <br />Revised Areas <br />2008 Reclamation activities <br />Areas (PH 1) <br />PH II <br />1A <br />Crushing & Screening <br />2008 <br />5.93 <br />5.93 <br />1B <br />Shop & Warehouse <br />2008 <br />3.11 <br />3.11 <br />1C <br />Fan Benchi <br />2008 <br />2.97 <br />2.97 <br />1D <br />Substation <br />2008 <br />0.34 <br />0.34 <br />2B <br />Portal Level <br />2008 <br />0.14 <br />0.14 <br />3A <br />Diversion Channel Cut <br />2008 <br />3B <br />Diversion Channel Cut <br />2008 <br />3C <br />Diversion Channel Cut <br />2008 <br />6.98 <br />6.98 <br />4A <br />Rock Cut above C & S1 <br />2008 <br />1.42 <br />1.42 <br />4D <br />Rock Cut below fan <br />1 <br />2008 <br />3.65 <br />3.65 <br />5A <br />Waste Rock Disposal Area <br />* <br />7.04 <br />7.04 <br />Total: 31.58 <br />31.58 <br />* Seeding of waste pile occurred as far back as 1983, but most recently in 2008 <br />2009 Reclamation activities <br />ZONE <br />DESCRIPTION <br />YEAR SEEDED <br />4C <br />Portal Bench <br />2009 <br />4.54 <br />4.54 <br />2E <br />Substation/Access Road <br />2009 <br />0.18 <br />0.18 <br />2D <br />Access Road <br />2009 <br />0.61 <br />0.61 <br />1E <br />Belt Transfer <br />2009 <br />0.35 <br />0.35 <br />2A <br />Shop/Warehouse <br />2009 <br />2.15 <br />2.15 <br />4B <br />Storage Bench <br />2009 <br />1.27 <br />1.27 <br />2C <br />Access Road <br />2009 <br />0.93 <br />0.93 <br />Asphalt Removal/Road Narrowing <br />4.2 <br />4.2 <br />Total: 14.23, <br />14.23 <br />Zone 5* <br />Borrow Area <br />3.52 <br />Haul Road/Cut & Fill <br />9.96 <br />*Seeded pre -law <br />I I I <br />I I <br />Total: 1 <br />13.48 <br />2017 Phase I Request SI -06 Requested Areas (PH 1) <br />-------------------------------------- ----- ----- <br />ROM Pond 2017 0.51 SL04 Released* <br />Pond 1 2017 2.31 Total for 4 ponds <br />Pond 2 2017 <br />Pond 3 2017 <br />Pond 4 2017 <br />--4 Gob Pile Pond 1 20171 1 0.45 1 SL04 Released* <br />*Reclamation work occurred in 2016, however, these areas were included in the boundaries that <br />obtained Phase 1 release with SL04. Therefore, they are not part of the Phase I area tabulation with SL06 <br />as the areas were already accounted for with the SL04 release. <br />