My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-22_REVISION - C1981038 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2018-01-22_REVISION - C1981038 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2018 12:37:43 PM
Creation date
1/29/2018 12:23:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
1/22/2018
Doc Name Note
Revised Cover sheet for Revised Pages
Doc Name
Application
From
JE Stover & Associates, Inc.
To
DRMS
Type & Sequence
SL6
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bond Release -3- <br />8. <br />3- <br />8. Bond Company: Lexon Insurance Company <br />9. Bond: Number: Corporate Surety, Bond No. 1071400, $2,500,000 <br />Corporate Surety, Bond No. 1071399, $815,000 <br />10. Current Total Bond Amount: $3,261,189.05 posted <br />11. Original Total Bond Amount: 1981 East Mine Bond - $1,116,500 <br />1986 West Mine Bond - $1,025,000 <br />12. Dollar Amount Requested for Release: $ 612,413 <br />13. Legal Description of Area Requested: Portions of: <br />Township 13 South, Range 92 West, 6t" P.M. <br />Sec. 2: SE%SE% <br />Sec. 10: Lot 14 <br />Sec. 11: NWS%SE%, NWS%SW%, SWS%SW%, <br />Sec. 13: NES%NW%, Lots 3, 5 & 12 <br />Sec. 14: NES%SE% <br />Sec. 15: Lots 3, 10 & 15 <br />Sec. 23: -Lots 1 and 3 <br />Sec. 24: Lot 4, S%2NE%, NW%SE% <br />14. A Map Showing the Area: Figures 1, 2 & 3 are enclosed <br />15. Dates Reclamation Work Performed: 2008, 2009, 2011 and 2017 <br />Revised November 17, 2017 <br />Revised January 19, 2018 <br />16. A description of results achieved: During 2008 partial reclamation of the Bowie No. 1 East Mine was <br />performed. (The 2008 reclamation is a continuation of the 2001 activities in which surface <br />structures were removed). The 2008 reclamation consisted of returning portions of the disturbed <br />area backto approximate original contours and hydro seeding with a permanent seed mix and wood <br />fiber mulch. <br />During 2009 final grading of the Bowie #1 East Mine was completed (excluding required sediment <br />control structures). The 2009 activities which were a continuation of the 2008 activities, included <br />the final grading and hydro seeding with an approved permanent seed mix, and mulched with a <br />wood fiber mulch. Seed tags are attached. <br />During 2011, additional hydroseeding was performed. Hydroseeding consisted of an approved <br />permanent seed mix, and was mulched with wood fiber much. <br />During 2017, Ponds 1-4 at the East Mine, the ROM pond, and the Gob pile pond were restored to <br />approximate original contour, mulched and seeded. <br />
The URL can be used to link to this page
Your browser does not support the video tag.