My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-18_REVISION - M1977219 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977219
>
2018-01-18_REVISION - M1977219 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:40:55 PM
Creation date
1/18/2018 4:15:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977219
IBM Index Class Name
Revision
Doc Date
1/18/2018
Doc Name
Adequacy Review Response #3
From
Environment, Inc.
To
DRMS
Type & Sequence
AM3
Email Name
ERR
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summit Brick and Tile Company Fox No 1 Clay Pit <br /> M-1977-219 -Adequacy Response#3 Page 5 <br /> provided an updated seed mixture and will likely revise the other 1990 reclamation <br /> recommendations. If NRCS has provided their updated reclamation recommendations to the <br /> Application, please forward these to the Division during the AM-03 review period. If the NRCS <br /> recommendations will not be prepared until after the close of the AM-03 review period, please <br /> commit to submitting theses as a Technical Revision to the approved Reclamation Plan. <br /> I contacted the NRCS again on January 8 , 2018 and have <br /> received no reply. If the NRCS sends recommendations that <br /> substantially change the ones on file, after the close of <br /> the AM-03 review period, Summit Brick will supply the <br /> report to the Division as a Technical Revision to the <br /> approved Reclamation Plan. <br /> EXHIBIT F -Reclamation Plan Map (Rule 6.4.6): <br /> 57. The Division believes the cross section on the Exhibit F Reclamation Plan Map incorrectly shows <br /> the clay seam intact under the backfill, which also results in errors associated with the backfill <br /> volumes in the December 20, 2017 Exhibit L. Please confirm that the clay seam will be mined and <br /> update this cross section. <br /> Attached is a revised copy of Map Exhibit F - Reclamation <br /> Plan Map with the corrected cross section for the file . <br /> If mining ended prematurely then there may be a small <br /> section of the clay has was not mined up to the rock face <br /> but for discussion the clay will be removed prior to <br /> reconstruction of the fill slope . <br /> EXHIBIT L—Reclamation Costs (Rule 6.4.12): <br /> 58. The Division has completed the Financial Warranty calculation for the proposed operation. Using <br /> the proposed AM-03 Mining and Reclamation Plans,the reclamation cost estimate has been <br /> calculated in the amount of$213,000.00. Please review the enclosed figures as soon as possible and <br /> contact our office if you have any questions or find any calculation errors. <br /> We have reviewed the Divisions bond estimate and <br /> understand the basis for the unit volumes . We reserve <br /> the right to file Technical Revisions to address <br /> revisions to the slope setback distances and a highwall <br /> stability analysis and ask for a reduction should it be <br /> warranted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.