Laserfiche WebLink
Summit Brick and Tile Company Fox No 1 Clay Pit <br /> M-1977-219-Adequacy Response#3 Page 4 <br /> Procedure Plan in the event the blaster finds unfired explosives. <br /> 55.11 Although the Applicant provided some details of the blasting records in the Blasting Plan, <br /> the blasting reports should contain the following minimum information: <br /> a. Name of the operator conducting the blast <br /> b. Location, date, and time of blast <br /> c. Name, signature, and license number of blaster-in-charge <br /> d. Identification, direction and distance, in feet, from the nearest blast hole to the nearest <br /> permanent man-made structure <br /> e. Weather conditions, including temperature, wind direction, and approximate velocity <br /> f. Type of material blasted <br /> g. Sketches of the blast pattern including number of holes, burden, spacing, and delay <br /> pattern <br /> h. Sketches shall also show decking, if holes are decked to achieve different delay times <br /> within a hole <br /> i. Diameter and depth of holes <br /> j. Types of explosives used <br /> k. Total weight of explosives used per hole and maximum weight of explosives used per <br /> 8-millisecond period <br /> 1. Initiation system <br /> in. Type and length of stemming <br /> n. Mats or other protections used <br /> o. Type of delay detonator and delay periods used <br /> p. Number of persons in the blasting crew <br /> q. Reasons and conditions for each unscheduled blast <br /> 55.12 Additionally, please commit to maintaining the following information, at minimum, <br /> for seismographic and airblast records: <br /> a. Type of instrument, sensitivity, and the calibration signal of the gain setting or <br /> certification of annual calibration <br /> b. Exact location of instrument and the date, time and its distance from the blast <br /> c.Name of the person and firm taking the reading <br /> d. Name of the person and firm analyzing the seismographic record <br /> e. The vibration and/or airblast level record <br /> EXHIBIT E - Reclamation Plan (Rule 6.4.5): <br /> 56. In response to Adequacy Item#46.2, the Applicant states they have contacted NRCS and they <br />