My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-18_REVISION - M1977219 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977219
>
2018-01-18_REVISION - M1977219 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:40:55 PM
Creation date
1/18/2018 4:15:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977219
IBM Index Class Name
Revision
Doc Date
1/18/2018
Doc Name
Adequacy Review Response #3
From
Environment, Inc.
To
DRMS
Type & Sequence
AM3
Email Name
ERR
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 18, 2018 <br /> BLASTING PLAN FOR SUMMIT BRICK AND TILE COMPANY-FOX PIT <br /> NEAR BEULAH COLORADO <br /> SCOPE OF WORK <br /> The quarry at Beulah has been developed for the extraction of the clay and sandstone as a stone <br /> product, and borrow. <br /> The following is the description of how the area is prepared for the drilling and blasting <br /> of this said material and the procedures used to accomplish this drilling and blasting. Although the <br /> sandstone is predominantly the material being shot, the clay at times will need to be shot. <br /> PREPARATION OF BLASTING AREA <br /> The area to be drilled and blasted is first stripped of the topsoil material, which will be saved in <br /> topsoil stockpiles.This preparation is done as to permit the safe and normal travel across the area by <br /> the drill, drill support equipment and the explosive blend truck. <br /> The areas for blasting are determined by the operators of the mining operation. <br /> PRE-BLAST SURVEY PROCEDURE: <br /> The Pre-Blast Survey will be used to document the existing condition of a structure(s) prior to the <br /> commencement of any blasting activities being conducted within one-half mile of the structure. Since <br /> this mine is nearly 2.5 miles long and will develop over a very long time, doing a Pre-Blast survey on all <br /> of the habitable structures within in the half mile radius of the permit boundary is impractical nor would <br /> it serve much purpose 40 years from now.This survey will be offered to the neighbors of Fox No 1 Clay <br /> Mine where a structure is located within one-half(1/2) mile of the blasting activities at no cost to the <br /> property owner. <br /> The pre-blast survey is meant to protect both the neighbor and Summit Brick and Tile Company. <br /> It does this by providing thorough documentation of the current, existing condition of the structures <br /> surrounding the mine. Once blasting has begun,this documentation will be used to compare any <br /> suspected changes that are reported to the original condition of the property.These surveys will be <br /> used to identify and record the pre-existence of visible cracking or other defects in a structure before <br /> blasting begins on a new Area. It is probable that some structures may have been inspected during the <br /> previous analysis because they were within one-half mile of the previous blasting area. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.