Laserfiche WebLink
Job Condition Correction Factor Source <br /> Operator Skill: 0.900 AB.AVG. <br /> Material consistency: 1.200 CAT HB <br /> Dozing method: 1.200 (SLOT) <br /> Visibility: 1.000 AVG. <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.900 (SSD-FC) <br /> Push gradient: 1.115 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 1.095 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 1.1820 <br /> Adjusted unit 517.48 LCY/hr <br /> production: <br /> Adjusted fleet 1034.96 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 2 Dozer(s) <br /> Unit cost: $0.441/LCY <br /> Total job time: 262.81 Hours <br /> Total job cost: $120,022 <br />