Laserfiche WebLink
BULLDOZER WORK <br /> Task description: Backfill pond <br /> Site: M&G Pit Permit Action: S03 2017 Permit/Job#: M1986079 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 12/21/2017 County: Adams Filename: NA <br /> User: JLE <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D9T-9SU <br /> Horsepower: 405 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $100.59 NA <br /> Operating Cost/Hour: $87.23 100 <br /> Ripper own. $0.00 NA <br /> Cost/Hour: <br /> Ripper op.Cost/Hour: $0.00 100 <br /> Operator Cost/Hour: $40.52 NA <br /> Total unit Cost/Hour: $228.34 <br /> Total Fleet Cost/Hour: $456.68 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 272,000 <br /> Swell factor: 1.000 <br /> Loose volume: 272,000 LCY <br /> Source of estimated volume: About 15,646.5 LCY/Acre at 17.36 acres of open water <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 300 feet <br /> Unadjusted hourly 437.8 LCY/hr <br /> production: <br /> Materials consistency description: Loose stockpile 1.2 <br /> Average push -5 % <br /> gradient: <br /> Average site altitude: 5,035 feet <br /> Material weight: 2,100 lbs/LCY <br /> Weight description: Earth-Loam <br />