My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-16_REVISION - M1986079
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986079
>
2018-01-16_REVISION - M1986079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:42:29 PM
Creation date
1/16/2018 12:16:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986079
IBM Index Class Name
Revision
Doc Date
1/16/2018
Doc Name
Request for Surety Reduction
From
Mann Resources
To
DRMS
Type & Sequence
SR4
Email Name
JLE
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: <br /> Site: M&G Pit Permit Action: S03 2017 Permit/Job#: M1986079 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 12/21/2017 County: Adams Filename: M079-000 <br /> User: JLE <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Backfill pond DOZER 2 262.81 $120,022.00 <br /> 002 S read topsoil over affected area SCRAPERI 1 31.96 $30,015.00 <br /> 003 Seed 44.6 acres REVEGE 1 44.60 $25,618.00 <br /> 004 Weed control entire site REVEGE 1 0.00 $6,145.00 <br /> 005 Mobilization and Demobilization MOBILIZE 1 3.20 $7,272.00 <br /> SUBTOTALS: 342.57 $189,072 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $3,819.25 <br /> Performance bond: 1.05 Total= $1,985.26 <br /> Job superintendent: 171.29 Total= $12,512.37 <br /> Profit: 10.00 Total= $18,907.20 <br /> TOTAL 0&P= $37,224.08 <br /> CONTRACT AMOUNT(direct+0&P)= $226,296.08 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 0.00 Total= 0.00 <br /> Engineering work and/or contract/bid preparation: 0.00 Total= $0.00 <br /> Reclamation management and/or administration: 5.00 $11,314.80 <br /> CONTINGENCY: 3.00 Total= $5,672.16 <br /> TOTAL INDIRECT COST= $54,211.04 <br /> TOTAL BOND AMOUNT(direct+indirect)= $243,283.04 <br /> Required Surety Amount= $243,300.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.