Laserfiche WebLink
SCRAPER TEAM WORK <br /> Task description: Spread topsoil over affected area <br /> Site: M&G Pit Permit Action: S03 2017 Permit/Job#: M1986079 <br /> PROJECT IDENTIFICATION <br /> Task#: 002 State: Colorado Abbreviation: None <br /> Date: 12/21/2017 County: Adams Filename: M079-002 <br /> User: JLE <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: I per day <br /> Equipment Description <br /> -Scraper: Cat 627G w/ ush- ull <br /> -Dozer: Cat D9T-9SU <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance-Motor Grader: CAT 12M <br /> -Water Truck: Water Tanker,5,000 Gal. <br /> Cost Breakdown: Scraper Work Team Support E ui ment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 100 NA NA 100 100 <br /> Ownership cost/hour: $99.75 $100.59 NA NA $28.02 $24.01 <br /> Operating cost/hour: $118.23 $87.23 NA NA $28.28 $34.13 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cost/hour: NA $0.00 NA NA $0.00 $0.00 <br /> Ripper op.cost/hour: NA $0.00 NA NA $0.00 $0.00 <br /> Operator cost/hour: $41.46 $40.52 NA NA $38.16 $39.38 <br /> Unit Subtotals: $259.44 $228.34 NA NA $94.46 $97.52 <br /> Number of Units: 2 1 0 0 1 1 <br /> Group Subtotals: Work: $747.22 Support: $0.00 Maint: $191.98 <br /> Total work team cost/hour:$939.20 <br /> MATERIAL QUANTITIES <br /> Initial volume: 24,000 CCY Swell factor: 1.000 <br /> Loose volume: 24,000 LCY <br /> Source of estimated volume: 44.66 acres partially backfilled(2017 ARR) <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 1,600 lbs/LCY Struck Volume: 15.70 LCY <br /> Material description: Top Soil Heaped Volume: 22.00 LCY <br /> Rated Payload: 52,800 pounds Average Volume: 18.85 LCY <br /> Payload Capacity: 33.00 LCY Adjusted Capacity: 18.85 LCY <br />