Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 011 Page 2 of 2 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.868 <br />Blade type: <br />1.000 <br />Net correction. 0.3890 <br />Adjusted unit production: 354.18 LCY/hr <br />Adjusted fleet production: 354.18 LCY/hr <br />JOB TIME AND COST <br />FIeet size: l Dozer(s) <br />Unit cost: ~$0.648/LCY <br />Total job time: 30.18 Hours <br />Total job cost: $6,930 <br />1 SHIFT/DA <br />(FND-RF) <br />(CAT HB) <br />:AT HI <br />'AT HI <br />(PAT) <br />