My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-11_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-01-11_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 12:59:35 PM
Creation date
1/11/2018 12:45:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
1/11/2018
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Colowyo Coal Company
Type & Sequence
RN7
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task # 0l2 Page l of 2 <br />Task description: <br />Site: Colowyo Coal Mine <br />BULLDOZER WORK <br />Middle Pond Removal <br />Permit Action: 13C <br />PROJECT IDENTIFICATION <br />Task #: 012 _ State: Colorado <br />Date: _311512017 County: Moffat <br />User: ZTT <br />Agency or organization name. DRMS <br />HOURLY E0-MMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per da <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour, <br />Operating Cost/Hour. <br />Ripper own. Cost/Hour: <br />Ripper op. Cost/Hour. <br />Operator Cost/Hour: <br />Total unit Cost/Hour. <br />Total Fleet Cost/Hour: <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: C0I9-012 <br />$229.67 <br />$229.67 <br />MATERIAL QUANTITIES <br />Initial Volume: 6,600 <br />Swell factor: 1.125 <br />Loose volume: 7,425 LCY <br />Source of estimated volume: Exh 7,Item 23,Fig. C8 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />115 feet <br />1,130.6 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />0% <br />6,900 feet <br />Material weight: 2,650 Ibs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />U_ _tilizati%n o <br />$100.59 <br />NA <br />$87.23 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$41.85 <br />NA <br />$229.67 <br />$229.67 <br />MATERIAL QUANTITIES <br />Initial Volume: 6,600 <br />Swell factor: 1.125 <br />Loose volume: 7,425 LCY <br />Source of estimated volume: Exh 7,Item 23,Fig. C8 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />115 feet <br />1,130.6 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />0% <br />6,900 feet <br />Material weight: 2,650 Ibs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />1.000 _ <br />m _ yEXCL.J_ _____ <br />Material consistency: <br />0.900 <br />CAT HB <br />Dozing method: <br />_ <br />1.000 <br />GEN. <br />Visibility: <br />1.000 <br />AVG. <br />
The URL can be used to link to this page
Your browser does not support the video tag.