Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 011 Page l of 2 <br />BULLDOZER WORK <br />Task description: Section 25 Pond Removal <br />Site: Colono Coal Mine Permit Action: 13C <br />PROJECT IDENTIFICATION <br />Task #: 011 State: Colorado <br />Date: 311512017 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown. <br />Cat D9T - 9SU <br />_405 <br />Semi -Universal <br />NA <br />1 per day _ <br />(CRG) <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. Cost/Hour: <br />Ripper op. Cost/Hour. <br />Operator Cost/Hour: <br />Total unit Cost/Hour_ $229.67 <br />Total Fleet Cost/Hour: $229.67 <br />Utilization 034 <br />$100.59 NA <br />$87.23 <br />$0.00 <br />$0.00 <br />$4I,85 <br />MATERIAL -QUANTITIES <br />Initial Volume: _9,500 <br />Swell factor: 1.125 <br />Loose volume: 10,688 LCY <br />Source of estimated volume: Exh 7,Item 23,Fi . C9 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />150 feet <br />910.5 LCY/hr <br />100 <br />NA <br />0 <br />NA <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />6,900 feet <br />2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: C019-011 <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />AVG. <br />Material consistency: <br />0.900 <br />CAT HB <br />Dozing method: <br />1.000 <br />_ <br />GEN. <br />Visibility: <br />1.064 <br />AVG. <br />