Laserfiche WebLink
Job No: 360100-004-04 Client:_LRM _ page 2 of 26 <br /> TE L E S T Task: Recl'n Cost Estimate Computed By:D. Bauer Date: 9/7/17 <br /> SOLUTIONS- 1 1+ r r, e V O N n i F 0 <br /> . . . . DRAFT-For DRMS Review Checked By: W.Niccoli Date: 12/30/17 <br /> Data and Assumptions: <br /> 1. Assume that all overburden and topsoil (combined 3' total over entire site) and fines (7%) <br /> in the reserves (alluvium) has to be moved back into the pit at reclamation for each phase <br /> 2. Assume that backfill around perimeter of the pit is compacted in lifts <br /> 3. Other Assumptions identified in calculation sheets <br /> 4. Haul distances are from centroid to centroid <br /> 5. Construction equipment ownership and operating costs Penton Media's Equipment Watch <br /> on-line construction equipment cost evaluator(Equipment Watch) <br /> 6. Demolition and miscellaneous costs summarized from the 2017 R. S. Means Heavy <br /> Construction Cost Data publication (Means) <br /> 7. Labor rates for equipment operators from US Bureau of Labor—Colorado Specific <br /> 8. Fuel rates were drawn Equipment Watch for Colorado <br />