My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-12-28_REVISION - M1981148
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981148
>
2017-12-28_REVISION - M1981148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:15 PM
Creation date
12/28/2017 4:15:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981148
IBM Index Class Name
REVISION
Doc Date
12/28/2017
Doc Name
Request for Technical Revision
From
General Shale Brick, Inc.
To
DRMS
Type & Sequence
TR2
Email Name
MAC
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT G <br /> WATER INFORMATION <br /> The main source of water in the mining areas was expected to come from <br /> minor surface water runoff. However, in 2005 groundwater was encountered in <br /> Stage 2 during mining. The Laramie and Fox Hills Formations are being mined at <br /> the Chieftain South Mine, therefore is it most likely that the water encountered is <br /> issuing from the Laramie Fox Hills Aquifer. Consequently, there is a year round <br /> pond in the mine. <br /> A gravel well permit application was sent to the State Engineer's Office <br /> (SEO) on September 28, 2007. General Shale disagreed with SEO's proposed <br /> water thickness and a new application was sent to the SEO on December 29, 2010. <br /> On September 25, 2011, the SEO issued well permit number 74957-F. General <br /> Shale then adjudicated the water for the Chieftain South Mine and the Chieftain <br /> North Mine for the properties they own on May 3, 2012. As part of the <br /> adjudication findings General Shale was required to file a new water well permit <br /> on July 17, 2012. SEO then issued a new well permit 76233-F, which is in place <br /> currently. <br /> General Shale has obtained a discharge permit from the Colorado <br /> Department of Health and Environment COG-501518 to allow dewatering of the <br /> mine and stormwater discharges from the mine. <br /> Stormwater from Green Mountain, located north of the mine, historically <br /> originated from the northeast corner of the mine and discharged near the southwest <br /> corner of the mine. In the mid 1990's a diversion berm was constructed to keep the <br /> mine area dry from the Green Mountain Stormwater. After the construction of the <br /> berm, the Green Mountain stormwater was discharged at the southeast corner of <br /> the mine. This was not an issue until the Solterra Subdivision Filing 13 was <br /> constructed. Solterra notified General Shale of the issue and General Shale will <br /> construct a ditch to carry the Green Mountain stormwater from the southeast <br /> 26 Revised December 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.