Laserfiche WebLink
RECLAMATION TIMETABLE <br /> Estimated Acres +/- <br /> Phase Years Slope Floor Revegetation Total <br /> 1 See Note 1 18.42 4.38 22.80 22.80 <br /> 2 35-60 8.78 8.77 17.55 17.55 <br /> 3 See Note 1 1.81 8.37 10.18 10.18 <br /> 4 55-60 19.26 19.25 38.51 38.51 <br /> 5 35-40 8.99 0 8.99 8.99 <br /> 6 40-50 13.04 0 13.04 13.04 <br /> 7 35-40 2.96 0 2.96 2.96 <br /> 8 55-60 15.71 1.77 17.48 17.48 <br /> TOTALS 88.97 42.54 131.51 131.51 <br /> Note 1: Reclamation is completed in these stages. <br /> Some reclamation periods will overlap and be in progress at the same time <br /> as others, allowing for initially mining and reclaiming one-half of the phase and <br /> then subsequently mining and reclaiming the remaining portion of the phase. <br /> 26 Revised October 2017 <br />