Laserfiche WebLink
corner along the southern permit boundary to discharge into the historic drainage <br /> located in the southwest corner of the mine. This ditch is anticipated to be <br /> completed in 2018. The Green Mountain Stormwater Ditch will remain <br /> throughout the life of the mine. During final reclamation, the Green Mountain <br /> Stormwater Ditch located along the south permit boundary will be reclaimed. A <br /> new Green Mountain Stormwater Ditch will be constructed across the pit floor. <br /> The exact location will be determined during final reclamation. <br /> 27 Revised December 2017 <br />