Laserfiche WebLink
Item Cost Comments <br /> Process Building Infrastructure 4500 This building to remain. (Horse Barn) <br /> Conveyors 4226 <br /> messing Equips ent / <br /> Pipe removal 3186 <br /> Pipe <br /> Pipe hauling 300 <br /> pe disposa <br /> Mist. Site Material 6500 Account for all mist. material on-site <br /> Dozer Work / <br /> ........ .................._ <br /> Active Gold Area: 134,100 CY @ $0.40/CY 53640 Backfill and grade active mining areas <br /> ravel 32000Y @001 � 2192 ,�aradeppt t �nix�g grav <br /> ISIMINW,All <br /> 3 Spread Topsoil <br /> ine(past taw)area (4 5")over <br /> Y <br /> / <br /> 5768 CY @ $1.50/CY 8709 ; Pre-law area (3.0") over 14.3 acres <br /> Reveg eta of Range Area <br /> 41.3 acres @$820/acre 33866 Total worst case disturbed area <br /> " $ / . �/� <br /> seeding(rangeland) <br /> t'avv mulch 500 acre %////�" <br /> 5 ! Soil Amendments 3575 <br /> ----- <br /> acres at$250/acre / app ied' o pry-laurr ark <br /> __.._._...___._....._...._..._.._...._...................................................._ ___.__........_...._......._._.................................. <br /> 6 Revegetation of Wetlands 723 <br /> 149`acres`@ $38 <br /> 7 Range Area Nursery Stock 983 <br /> ......... <br /> N'' .21 acres @445'OS '" <br /> 8 Mobilization/Demobilization 6199 <br /> t D8,Cat 980,Cat 7 135 , <br /> Dir O,EI <br /> ,y .....,. <br /> DRMS add-on costs (admin, <br /> acting,etc.) <br /> 71 <br /> The current approved bond is for$236,221.00. Therefore,no additional bond is needed for this <br /> amendment. <br /> Alma Placer Mine CrM►.w"iaud,germ L: <br /> December 2017 L-2 <br />