Laserfiche WebLink
(o) Explosives Use <br /> Explosives will not be used during the installation, operation, or <br /> maintenance of the Gold Hill Mill Waterline. <br /> (2) MILLING PROCESSES/TAILINGS FACILITIES <br /> (a) Plant Facilities <br /> There will not be any milling processes or tailings facilities on any of the <br /> surface lands directly associated with the installation, operation, or <br /> maintenance of the Gold Hill Mill Waterline. The Gold Hill Mill has been <br /> repaired, rehabilitated, improved and restored to its original flow sheet in <br /> anticipation of resuming mineral processing operations. It includes a <br /> permitted tailings storage facility. <br /> (b) Tailings <br /> Item not applicable. See "(a)", above. <br /> (c) Drainage Control <br /> Item not applicable. See "(a)", above. <br /> (d) Maps and Plans <br /> Item not applicable. See "(a)", above. <br /> Exhibit C— Mining/Milling Plan 4 <br />