My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-12-19_REVISION - M1994117
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994117
>
2017-12-19_REVISION - M1994117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:35:19 PM
Creation date
12/20/2017 9:30:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
REVISION
Doc Date
12/19/2017
Doc Name
Request For Amendment To Permit
From
Gold Mill Hill
To
DRMS
Type & Sequence
AM1
Email Name
AME
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D - RECLAMATION PLAN <br /> (1) RECLAMATION PLAN <br /> Permit No. M-1999-117 already has an approved reclamation plan for <br /> areas of disturbance associated with the original permit area of the Gold <br /> Hill Milling facility. Reclamation of the subject incremental surface <br /> disturbances will be consistent with the approved plan at the Gold Hill Mill. <br /> Left Hand Creek Pump Station <br /> The Left Hand Creek Pump Station will consist of a foot bridge across the <br /> creek and a metal "conex" containing the Bean pump and the generator to <br /> power the pump. Both of these structures can be moved with a fork lift and <br /> transported on a flatbed truck or trailer. Neither of these structures will be <br /> placed on a permanent concrete foundation, so there will not be any <br /> excavation involved in the final reclamation of this site. Removing the foot <br /> bridge and the "conex" will involve an equipment operator and two workers <br /> to guide and assist the equipment operator. This can be accomplished in <br /> one working day. <br /> Gold Hill Mill Pipeline <br /> Removing the Gold Hill Mill Pipeline will involve two workers cutting the <br /> two (2) inch pipeline into manageable lengths, and hauling these sections <br /> to a vehicle for removal to a licensed disposal site. The disposal of the <br /> pipeline using a flatbed truck will require four roundtrips to the Boulder <br /> disposal site per day for three days. This will involve an additional worker <br /> driving to and from the disposal site for three days. <br /> Times Mine Adit Portal <br /> The Times Mine adit portal culvert has a secure metal door that is locked <br /> to prevent unauthorized access. The five (5) foot diameter galvanized <br /> steel culvert will not collapse from the weight of the overlying material, and <br /> the mine workings do not produce any acid mine drainage. When the Gold <br /> Hill Mill Waterline is decommissioned the pipeline into the Times Mine adit <br /> will be capped to prevent water flowing from the mine workings. Other <br /> than permanently securing the metal door on the culvert, there is nothing <br /> that will need to be reclaimed at this site. This work can be accomplished <br /> in less than two hours. <br /> Exhibit D— Reclamation Plan 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.