Laserfiche WebLink
Clayton Wein -2- November 17. 2017 <br />was inadvertently left off of the area summary and have been added to the <br />revised application and Figure 1 and the ROM pond figure. As a side note, the <br />area for the Gob Pile pond was included in the SL04 bond release and received <br />Phase I release. That has been revised with this application. The area associated <br />with the Gob Pile Pond is 0.13 acres. It has been removed from the Phase II <br />request area, and included in the Phase I area. <br />It is assumed that Zone 5 as shown on the SL04 Figure, and on the revised bond <br />release application, was seeded pre -law during development of the East Ridge <br />Waste Pile. There are no records of the area being seeded going back as far as <br />1983, and, it meets the vegetation standard. A portion of the area had <br />supplemental seeding done in 2011. <br />2. DRMS: Please update Exhibit 1 to reflect the changes in acreages associated <br />with the Phase I request and Phase II request. The inspection of the <br />requested sites removed some sites requested as Phase II (ponds and drill <br />pads) and added them to the Phase I request. Please include in the table the <br />acreages associated with the East Mine borehole pads 1 through 4. Drill Pad <br />2011-1 was also removed from the SL -6 inspection all together. <br />BRL: The acreages associated with drill holes BH 1 through BH 4 is unknown, they <br />are within the disturbed area boundary, were drilled and then reclaimed as part of <br />the overall East Mine reclamation. They are part of the East Mine that received <br />Phase I release in 2013, and are included in the Phase II request with this bond <br />release. Drill Pad 2011-1 has been removed from the SL06 documents. <br />3. DRMS: Please update the Reclamation Map to reflect the changes made to the <br />Phase I and Phase II requests. <br />BRL: The Reclamation Map (Figure 1) has been updated to reflect Phase I and Phase II <br />request areas. <br />4. DRMS: Please update Figure 2 to reflect the removal of site 2011-1 from the phase <br />request. <br />BRL: Figure II has been updated, site 2011-1 has been removed. <br />5. DRMS: Please update Figure 3 to reflect the change at the ROM Pond from a Phase <br />II request to a Phase I request. <br />BRL: Figure 3 has been updated. <br />