Laserfiche WebLink
November 15, 2017 C-1981-038/Bowie No. 1 Mine CCW <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 4 of 8 <br /> <br />leaving the site. The silt fences continue from the hay bales up the hillslopes. This was designed to help the hay <br />bales during large precipitation events. <br /> <br />Photo 1: The reclaimed Waste Pile Pond Site. Photo 2: Sediment logs at the outlet of the Waste Pile <br />Pond reclamation site. <br /> <br />Photo 3: The Binwall Pond 2 reclamation site. Photo 4: the outlet with sediment control measures at <br />the Binwall Pond 4 reclamation site. <br /> <br /> <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br />Drainage – Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> There are two ponds located at the West Mine, WS -1 and WS-2. Both of the ponds were dry during the <br />inspection. Vegetation is well established on the embankments. The ponds were stable and there were no