Laserfiche WebLink
9. The location of'the realigned Platte City Ditch is not shown on the revised <br /> Reclamation Plan Nlap. Please depict and label the Platte City Ditch on the revised <br /> Reclamation Plan Map. <br /> See the revised Map F-1. <br /> 10. The Applicant did not update the Mining Plan to account for relocation of the Platte <br /> City Ditch. The Mining Plan shall be updated to provide the following information: <br /> a. Specifv the timing gf'relocating the Platte City Ditch. <br /> The Platte City Ditch will be relocated within 180 days of the approval of this technical revision <br /> by the Division. <br /> b. Provide a commitment to professionally survey the new alignment of the Platte <br /> Citv Ditch. <br /> The new ditch alignment will be mapped for general knowledge only. <br /> c. Provide a commitment to have the Platte City Ditch inspected by a qualified <br /> engineer following the realignment of'the Platte City Ditch, with findings from <br /> the inspection submitted to the Division in writing. <br /> High Speed Mining personnel will inspect the ditch for usability, but no engineering design or <br /> certification will be provided. It is not necessary, as the water commissioner has informed the <br /> operator that they have the right to re-align the ditch as they see fit. <br /> d. Specific the material which will be used for the bed lining of'the Platte City <br /> Ditch. <br /> No bed lining will be used in the ditch, as it will be excavated in the native material, which has <br /> shown a low permeability. This is the same as the ditch currently exists in. <br /> e. Provide a commitment to notify the Division and the District 23 Water <br /> Commissioner prior to running water through the realigned Platte City Ditch, <br /> so that the ditch may,be inspected to ensure it was constructed in accordance <br /> with the approved'dining and Reclamation Plans. <br /> The water commissioner will be notified once the new ditch alignment is in place. This is <br /> typically done informally, with a phone call. <br /> Conclusion <br /> The table below lists the revised pages, new pages, and revised maps attached to this response. <br /> Attachment Table <br /> Attached Page Attached Map <br /> Commissioner email C-2 <br /> F-1 <br /> Please contact me with any further questions. <br /> Regards, <br /> Fairplay Au TR07 3 _:-�+ra. .. 3-.{„t<•.�=+_ <br />