My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-19_REVISION - M2000041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000041
>
2017-10-19_REVISION - M2000041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:07 PM
Creation date
10/20/2017 10:03:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000041
IBM Index Class Name
REVISION
Doc Date
10/19/2017
Doc Name Note
Requested Docs
Doc Name
Adequacy Review
From
Fremont Paving
To
DRMS
Type & Sequence
TR4
Email Name
ERR
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 - GENERAL REQUIREMENTS <br /> SECTION 01025-MEASUREMENT AND PAYMENT <br /> PART 1-GENERAL <br /> The entire cost of the work and the material necessary to complete all items shown on the Contract Documents or <br /> specified herein,shall be included and merged into the pay items in the Proposal Schedule. All payments shall be <br /> subject to the conditions of these specifications. Any work not specifically listed is to be included in these items. <br /> All pay items shall include materials,transportation expenses to the job site,cost of installation,maintenance during <br /> construction,guarantees and warranties(if applicable),profit,sales tax,license,permits,and other taxes required for <br /> the completion of the project in-place for each item in the Proposal Schedule. Payment for items on a"lineal foot <br /> basis"shall be measured upon the horizontal plane after installation. Payment for items will be made after <br /> installation. <br /> No additional compensation will be allowed for any item beyond the limits as shown on the Contract Drawings <br /> without prior written approval of the Engineer. For earthwork items,no adjustment to the extended cost,as bid,will <br /> be made unless the measured quantity differs from the bid quantity by greater than 5%. <br /> 1. Mobilization/Demobilization <br /> Furnish at the job site all equipment,facilities,and materials required to complete construction of <br /> the slurry wall platform,slurry wall,and overflow spillway. This item shall include,but is not <br /> limited to,move-in,move-out,bonds and insurance,setting up construction trailers,site <br /> preparation,and staging area preparation. This item will be paid on a lump sum basis with the <br /> following schedule: 50%of this item shall be paid at the job startup,25%of this item shall be <br /> paid at the completion of 50%of the contract value and the final 25%shall be paid at substantial <br /> completion. <br /> 2. Slurry Wall Platform and Embankment Construction <br /> Furnish all equipment,labor and materials required for construction of the slurry wall platform for <br /> the project including but not limited to:removal of all incidental vegetation in affected areas, <br /> including hauling offsite and disposal of removed brush and trees;compacted fill necessary to <br /> widening the platform;bedrock cleaning and preparation in areas where the platform fill and <br /> bedrock interface;final grading and site cleanup <br /> after slurry wall construction. The excavation,if necessary,and compacted fill shall be <br /> completed to the lines and grades shown on the plans in accordance with the plans and <br /> specifications. The platform compacted fill shall be paid on an in-place per cubic yard basis. The <br /> site road shall be measured and paid on a per lineal foot basis. <br /> 3. Hauling and Placement of Supplemental Fines <br /> Furnish all equipment,labor,and materials required for the hauling and placement of <br /> supplemental fines along the proposed slurry wall alignment at the rate described in the plans. <br /> The hauling and placement of supplemental fines shall be paid on a per cubic yard basis. <br /> 4. Slurry Wall Construction <br /> Furnish all equipment,labor,and materials required for the construction of the slurry wall <br /> platform,soil-bentonite slurry wall and installation of final slurry wall cap in accordance with the <br /> plans and specifications. The slurry wall shall be measured and paid on a square foot basis. <br /> Square footage for lead-in trenches and overlaps for"scissor cuts"or closure of the slurry wall <br /> shall be considered incidental to the work and shall not be included in the measurement for <br /> payment. The slurry wall platform shall be measured and paid in place on a per cubic yard basis. <br /> February 2016 Section 01025-Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.