DIVISION 1 - GENERAL REQUIREMENTS <br /> SECTION 01010-SUMMARY OF WORK <br /> Furnish all equipment,labor,and materials for construction of the complete Stonewall Springs Quarry Southwest <br /> Reservoir Slurry Wall as detailed in the Construction Documents. The work includes,but is not limited to,the <br /> following work items: <br /> ■ Mobilization to and demobilization from the site of all equipment,personnel,and materials required to <br /> complete the work. <br /> ■ Slurry wall platform construction including construction of an earthen embankment. <br /> ■ Soil-bentonite slurry wall construction including slurry wall platform construction. <br /> ■ Construction of a slurry wall cap and grading/cleanup of excess soil-bentonite backfill and supplemental <br /> fines at the surface. <br /> ■ Final grading including the road,and area surrounding the reservoir. <br /> ■ As-constructed survey documenting the completed construction including final elevations and contours of <br /> all structures or features built as part of this project. <br /> END OF SECTION <br /> February 2016 Section 01010-Page 1 of 1 <br />