5. As-Constructed Information <br /> Furnish all equipment,labor,and materials for completion of the as-constructed documentation of <br /> the completed construction including but not limited to,preparation redline as-constructed plans <br /> with all pipe inverts,final grades and contours of all structures built as part of this project;a <br /> second order baseline survey of the movement monuments in accordance with the plans and <br /> specifications. This item shall be paid on a lump sum basis. <br /> END OF SECTION <br /> Section 01025-Page 2 of 2 February 2016 <br />