Laserfiche WebLink
September 21, 2017 C-1996-083/Bowie No. 2 Mine CCW <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 3 of 7 <br /> <br />below the discharge outlet. The em bankments of the pond were well vegetated and stable. There were no <br />erosional features identified. <br /> <br />- Sediment Pond D: (Photo 1) <br /> The pond was holding water during the inspection. The water level in the pond had not reached the discharge <br />outlet. The embankments of the pond were stable and well vegetated. There were no erosional features. <br /> <br />- Sediment Pond F: <br /> Pond F was holding some water at the time of the inspection. There was not enough water impounded in the <br />pond to reach the level of the discharge outlet. The embankments of the pond were well vegetated and there were <br />no indications of erosion. The pond was stable. <br /> <br />- Sediment Pond J: (Photo 2) <br /> During the inspection Pond J was holding water. The level of water in the pond had not reached the discharge <br />outlet. The embankments of the pond were stable and well vegetated. There were no indications of erosion. <br /> <br />- Sediment Pond K: <br /> Sediment Pond K was dry and stable during the inspection. The embankments of the pond were well <br />vegetated. No erosional features were identified. <br /> <br />The Ditches on Gob Piles 2, 3 and 4 were inspected. The ditches were in good repair and capable of functioning <br />as designed. Recent repairs to ditches on Gob Pile 3 had b een conducted. Repairs on the eastern portion of Gob <br />Pile 2 had also been conducted. Please see the Processing Waste section of this report for more details. <br /> <br /> <br />Photo 1: Pond D Photo 2: Pond J <br /> <br />