My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-28_REVISION - M1981185 (106)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2017-09-28_REVISION - M1981185 (106)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:16:35 PM
Creation date
10/4/2017 4:22:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
Revision
Doc Date
9/28/2017
Doc Name Note
Part 1 of 12
Doc Name
Request For Amendment To Permit
From
Sunrise Mining, LLC
To
DRMS
Type & Sequence
AM2
Email Name
LJW
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Renovate the La Plata River Bridge in accordance with TR -3 (see Attachment D-2); <br />o As necessary build fences; <br />o Remove and dispose of slash and waste wood in approved landfills; <br />o No new roads will be constructed; however, historical and existing roads will be <br />maintained; <br />Base of Operations <br />o Construct the Base of Operations, as designed; <br />o Establish site security; <br />• May Day No. 1 (Figure D-6) <br />o Remove and salvage mill equipment; <br />o Remove and salvage crushers; <br />o Install generators and ventilation fans; <br />o Haul debris to an offsite landfill; <br />o Recycle scrap metal; <br />o Grade the bench; <br />o Install erosion control BMP structures; <br />o Install fire suppression water bladder; <br />o Construct temporary ore storage pad; <br />o As necessary, establish sound and visual barriers; <br />• May Day No. 1 East <br />o No construction activities will be conducted; <br />o If necessary, site foundation geotechnical studies will be conducted in accordance <br />with an approved Technical Revision (TR). <br />• May Day No. 2 (Figure D-7 and D-8) <br />o Construct temporary ore storage pad; <br />o Establish a truck turnout; <br />o Install fire water suppression bladder; <br />o Install erosion control BMPs; <br />• May Day No. 2 East <br />o No construction activities will be conducted; <br />o Area will be used (as necessary) to store snow; <br />• May Day No. 3 <br />o No construction activities will be conducted; <br />• Chief <br />o No construction activities will be conducted; <br />• Pay Day Idaho <br />o Idaho warehouse will be used to store equipment and core samples; <br />o Idaho (small office) will be used as a mine office; <br />o Install fire suppression water bladder; <br />o Install erosion control BMPs; <br />A Stormwater Management Plan has been approved by the Colorado Department of Public Health and the <br />Environment (CDPHE) (Section 6.4.20.10). In accordance with this Plan, Best Management Practices <br />(BMP) (Exhibit D —Figure D-9) have or are planned to be installed. The BMP controls' features include <br />but are not limited to: <br />Rolling water bars; <br />Riprapped and wattle protected runouts; <br />Crash and erosion barriers; <br />See Exhibit U -Surface Water Management Plan. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.