Laserfiche WebLink
29 August, 2017 C-1981-010/Trapper Mine RAR <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 0 <br /> <br /> Page 3 of 10 <br /> <br /> <br /> <br /> Photo 2: Dozer grading placing material for approximate original contour. Photo taken from parcel KA16 looking <br />north. <br /> <br />Phase I Parcels: <br />AB14 AB16 KZ16 <br />ZA14 ZA15 ZAB16 <br />Drainage Parcels <br />AB09 AB16 FA16 <br /> <br /> <br /> Photo 3: Know elevation marker <br />and Bad Elf GNSS Surveyor. <br /> <br />The coordinates of a baseline elevation data point, an <br />established survey point maintained and known by TMI to be <br />7069.89 feet above sea level near the storage tanks (Photo 3) <br />was measured by DRMS. The difference between the <br />measurements will be calculated and compared with Trappers <br />approximate original contour maps. Approximate grade and <br />slope of the reclaimed parcels was also measured in the field <br />and will likewise be compared to Trappers submitted maps, <br />facilitating the determination that approved post mining topo <br />has been constructed. <br /> <br /> <br />