Laserfiche WebLink
Gravel Operation Worst Case Reclamation Costs and Timetable <br /> Task Description Time Cost <br /> Needed <br /> 1 Remove Facilities, including portion of office building, fuel tanks, pump 1.5 $9,000 <br /> and piping, misc. <br /> Regrade 14.3 acres of site using Cat D-8 dozer(32,000 cy @ $0.38 per <br /> 2 cy). This includes collection ditches, cer-tain ponds, final cuts, camp 0.5 $12,192 <br /> areas, plant area and shop area. <br /> Move topsoil stockpile material to 14.3 acres of disturbed area 4.5" thick. <br /> 3 Move with truck/loader and spread with Cat D-5. (17,606 cy @ $1.51 per 1 $13,064 <br /> cy) <br /> 4 Final grading of soil. Use Cat D-5. Cost is $250/acre x 14.3acres. 0.5 $7,275 <br /> 5 Application of fertilizer to all areas with substitute fines. 14.3 ac @ 0.5 $3,575 <br /> $250/ac <br /> 6 Broadcast seed in wetland areas. 1.59 Acres x $474.9 per acre +$100 0.5 $914 <br /> application cost. <br /> 7 Broadcast seed in range areas. 14.3 Acres x $126.9 per acre +$100 0.2 $l 0,395 <br /> application cost. Straw mulch @ $500/ac. <br /> 8 Plant tree saplings in certain areas. 2.32 Acres x $129.7 per acre + $100 0.2 $532 <br /> per acre application cost. <br /> Totals 4.9 $56,947 <br /> DMG Costs (28% x direct costs) $15,945 <br /> Total Bond Amount $72,892 <br /> 3. Overall Operation Bond <br /> The total proposed bond for the 2015 Amendment is therefore $72,892 + $194,237 = $267,129 <br /> Alma Placer L-4 <br />