Laserfiche WebLink
DIVISION 1 - GENERAL REQUIREMENTS <br />SECTION 01050 - FIELD ENGINEERING <br />PART 1 - GENERAL <br />1.01 SURVEYING <br />The Surveyor has established horizontal and vertical control points. The Contractor shall verify <br />the control points and provide construction stakes, Upon completion of the work, Contractor <br />shall subcontract to King Surveyors to provide a topographic survey of the Iverson Mine permit <br />area, stamped by a licensed surveyor. <br />1.02 SUPERVISION <br />The Contractor shall have supervisory personnel, knowledgeable of the project requirements and <br />proper installation and construction procedures, available in the field at all times that work is <br />progressing_ <br />END OF SECTION <br />Iverson Mine Grading Section 01050 - Field Engineering <br />133-24097-15001 Page 1 of 1 <br />