My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-01_REVISION - M2011001
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2011001
>
2017-09-01_REVISION - M2011001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:54:18 PM
Creation date
9/5/2017 9:07:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011001
IBM Index Class Name
Revision
Doc Date
9/1/2017
Doc Name
Request for Technical Revision
From
Martin Marietta Materials, Inc.
To
DRMS
Type & Sequence
TR1
Email Name
PSH
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.03 IMPORT AND PLACEMENT OF TOPSOIL. <br />A. This shall be paid on a per -cubic -yard basis, for the in-place topsoil placed at the Iverson <br />Mine, <br />B. Furnish all labor, equipment, and materials to import topsoil from the Parsons Mine and <br />place topsoil at the Iverson Mine, including but not limited to: excavation and loading <br />from topsoil borrow areas, hauling, unloading, and placing topsoil; and all other items <br />either shown or implied in the Construction Drawings and Specifications. <br />C. There is no separate pay item for dewatering, clearing, and grubbing. <br />2.04 DRILL SEEDING ON FLAT AREAS <br />A. This item shall be on a per square -foot basis. <br />B. Furnish all labor, equipment, and materials to drill seed at the mine, per direction of Martin <br />Marietta, including but not limited to: procuring, transporting, fertilizing, and drill seeding, <br />and all other items either shown or implied on the Construction Drawings and Specifications. <br />4:401li: CX§ &`I11079�1 <br />A. This shall be paid on a per square foot basis. <br />B. Furnish all labor, equipment, and materials to hydroseed the mine per direction of Martin <br />Marrietta, including, but not limited to: procurement, transport, fertilizing, and <br />hydroseeding, and all other items either shown or implied in the Construction Drawings <br />and Specifications. <br />2.06 ROAD BASE <br />A. This item shall be paid on a per square yard basis. <br />B. Furnish all labor, materials and equipment necessary to construct a road base surfaced <br />access road across the spillways as specified in the Construction Drawings and <br />Specifications. Martin Marietta shall provide and deliver the road base. <br />C. There is no separate pay item for dewatering. <br />2.07 PLS SURVEY BY KING SURVEYORS <br />A. This item shall be paid on a lump sum basis. <br />B. Contractor shall subcontract to King Surveyors of Windsor, Colorado to provide a <br />topographic survey of the Iverson Mine permit area. The survey shall be stamped by a <br />professional land surveyor licensed in the State of Colorado. <br />END OF SECTION <br />Iverson Mine Grading Scction 01025 Measurement and Payment <br />133-24097-15001 Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.