My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-01_REVISION - M2011001
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2011001
>
2017-09-01_REVISION - M2011001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:54:18 PM
Creation date
9/5/2017 9:07:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011001
IBM Index Class Name
Revision
Doc Date
9/1/2017
Doc Name
Request for Technical Revision
From
Martin Marietta Materials, Inc.
To
DRMS
Type & Sequence
TR1
Email Name
PSH
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 1 - GENERAL REQUIREMENTS <br />SECTION 01025 - MEASUREMENT AND PAYMENT <br />PART 1 - GENERAL <br />I.01 All work necessary to fully complete this project in accordance with the Contract Documents is to <br />be provided by the Contractor, and paid for under items of work set forth in the Bid Schedule. <br />Any work not specifically listed is to be included in these items. No additional payments will be <br />made for any work which is not set forth in the Bid Schedule. <br />1.02 Furnish all labor, equipment, and material to grade, import and place topsoil, drill seed, <br />hydroseed, and subcontract with King Surveyors to provide a PLS stamped survey of the final <br />topography ai the Iverson Mine permit area in accordance with the technical specifications and <br />construction plans. The work, in general, involves excavation, filling and grading, protection of <br />existing utilities, and miscellaneous construction incidentals and appurtenances thereto. <br />1.03 No additional compensation will be allowed for any item beyond the limits as shown on the <br />Contract Drawings without the prior written approval of Martin Marietta. <br />1.04 All quantities in the Bid Schedule are estimated volumes based on the Contract Drawings and are <br />approximate, unit rates will be adhered to for all final quantities. No adjustment to the payment <br />of any item based on as -installed volumes without prior written approval of the Martin Marietta_ <br />PART 2 - MEASUREMENT AND PAYMENT <br />2.01 MOBILIZATION AND DEMOBILIZATION <br />A_ This item shall include all of the costs for labor, materials, and equipment necessary to <br />complete mobilization, including, but not limited to, furnishing all equipment facilities at <br />the job site; materials to complete the work; installation of erosion control structures, <br />including silt fencing; obtaining insurance, and related items; and all other items shown <br />or implied in the contract documents. This item shall be paid on a lump sum basis. <br />2,02 SITE GRADING TO SUBGRADE <br />A. This item shall be paid on a cubic yard basis, for both cut and fill grading. <br />B_ Furnish all labor, equipment, and materials for clearing, grubbing, excavating, filling, <br />using a rock grader to remove rocks larger than 1.5 inches (1.5") in the uppermost lift, <br />grading to the subgrade topography, including, but not limited to: excavating and hauling, <br />shaping, and all items either shown or implied in the Construction Drawings or <br />Specifications. <br />C. There is no separate pay item for dewatering, clearing and grubbing. <br />Iverson Mine Grading Section 01025 — Measurement and Payment <br />133-24097-15001 Page] oft <br />
The URL can be used to link to this page
Your browser does not support the video tag.